Winner Hydraulics EP-21E-X-Y-Z-05
Winner Hydraulics EP-21E-X-Y-Z-05
Product Attributes
- WeightKg
- 0.35
- Installation torqueNm
- 80 - 100
- Cavity Tooling
- 21E-2
- Mounting Position
- Unrestricted
- Filtrationµm
- 25.0
- Minimum Voltage Required%
- 90.0
- WeightKg
Pressure Attributes
- Max PressureBar
- 350.0
- Max PressureBar
Flow Attributes
- Rated Flowl/min
- 150.0
- Fluids Temperatures°C
- -40 - 120
- Internal Leakagecc/minute
- 0.15
- Rated Flowl/min
SKU | Structure (X) | Operations (Y) | Options (Z) | Price | Add to shopping cart | Favorites | |
---|---|---|---|---|---|---|---|
EP-21E-2A-12-N-05 | 2 Ports, 20 Watt. Coil | Normally-Closing Internal Reverse Check Valve | Non-adjustable | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-12-P-05 | 2 Ports, 20 Watt. Coil | Normally-Closing Internal Reverse Check Valve | Push Style Manual Override | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-12-T-05 | 2 Ports, 20 Watt. Coil | Normally-Closing Internal Reverse Check Valve | Push and Twist Style Manual Override | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-31-M-05 | 2 Ports, 20 Watt. Coil | Normally-Closed Double Lock | Screw-Out Knob Style | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-31-N-05 | 2 Ports, 20 Watt. Coil | Normally-Closed Double Lock | Non-adjustable | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-32-N-05 | 2 Ports, 20 Watt. Coil | Normally-Closed Double Lock | Non-adjustable | €110,80 | Delivery time: 8-10 weeks | ||
EP-21E-2A-32-P-05 | 2 Ports, 20 Watt. Coil | Normally-Closed Double Lock | Push Style Manual Override | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-32-T-05 | 2 Ports, 20 Watt. Coil | Normally-Closed Double Lock | Push and Twist Style Manual Override | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-01-M-05 | 2 Ports, 20 Watt. Coil | Normally-Closed No Reverse Flow Energized | Screw-Out Knob Style | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-01-N-05 | 2 Ports, 20 Watt. Coil | Normally-Closed No Reverse Flow Energized | Non-adjustable | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-02-N-05 | 2 Ports, 20 Watt. Coil | Normally-Open No Reverse Flow De-energized | Non-adjustable | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-02-P-05 | 2 Ports, 20 Watt. Coil | Normally-Open No Reverse Flow De-energized | Push Style Manual Override | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-02-T-05 | 2 Ports, 20 Watt. Coil | Normally-Open No Reverse Flow De-energized | Push and Twist Style Manual Override | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-03-M-05 | 2 Ports, 20 Watt. Coil | Normally-Closed Reverse Flow Energized Nose-in Side-out Operation | Screw-Out Knob Style | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-03-N-05 | 2 Ports, 20 Watt. Coil | Normally-Closed Reverse Flow Energized Nose-in Side-out Operation | Non-adjustable | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-04-N-05 | 2 Ports, 20 Watt. Coil | Normally-Open Reverse Flow De-energized Nose-in Side-out Operation | Non-adjustable | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-04-P-05 | 2 Ports, 20 Watt. Coil | Normally-Open Reverse Flow De-energized Nose-in Side-out Operation | Push Style Manual Override | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-04-T-05 | 2 Ports, 20 Watt. Coil | Normally-Open Reverse Flow De-energized Nose-in Side-out Operation | Push and Twist Style Manual Override | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-05-M-05 | 2 Ports, 20 Watt. Coil | Normally-Closed Reverse Flow Energized | Screw-Out Knob Style | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-05-N-05 | 2 Ports, 20 Watt. Coil | Normally-Closed Reverse Flow Energized | Non-adjustable | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-06-N-05 | 2 Ports, 20 Watt. Coil | Normally-Open Reverse Flow De-Energized | Non-adjustable | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-06-P-05 | 2 Ports, 20 Watt. Coil | Normally-Open Reverse Flow De-Energized | Push Style Manual Override | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-06-T-05 | 2 Ports, 20 Watt. Coil | Normally-Open Reverse Flow De-Energized | Push and Twist Style Manual Override | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-09-M-05 | 2 Ports, 20 Watt. Coil | Normally-Closed No Reverse Flow Energized Nose-in Side-out Operation | Screw-Out Knob Style | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-09-N-05 | 2 Ports, 20 Watt. Coil | Normally-Closed No Reverse Flow Energized Nose-in Side-out Operation | Non-adjustable | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-10-N-05 | 2 Ports, 20 Watt. Coil | Normally-Open No Reverse Flow De-energized Nose-in Side-out Operation | Non-adjustable | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-10-P-05 | 2 Ports, 20 Watt. Coil | Normally-Open No Reverse Flow De-energized Nose-in Side-out Operation | Push Style Manual Override | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-10-T-05 | 2 Ports, 20 Watt. Coil | Normally-Open No Reverse Flow De-energized Nose-in Side-out Operation | Push and Twist Style Manual Override | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-11-M-05 | 2 Ports, 20 Watt. Coil | Normally-Closed Internal Reverse Check Valve | Screw-Out Knob Style | €99,89 | Delivery time: 8-10 weeks | ||
EP-21E-2A-11-N-05 | 2 Ports, 20 Watt. Coil | Normally-Closed Internal Reverse Check Valve | Non-adjustable | €99,89 | Delivery time: 8-10 weeks |
Found what you are looking for?
We would love to talk to you about engineering and other services surrounding hydraulics. Get in touch with us to discover the possibilities!
Request Quotation
Learn more about this product
Download the free datasheet to read about this product.
Download Datasheet