VIS Hydraulics SVA0.S08

VIS Hydraulics SVA0.S08
  • VIS Hydraulics SVA0.S08
  • VIS Hydraulics SVA0.S08
  • VIS Hydraulics SVA0.S08
  • VIS Hydraulics SVA0.S08
  • VIS Hydraulics SVA0.S08
  • VIS Hydraulics SVA0.S08
  • VIS Hydraulics SVA0.S08
A solenoid valve operated, 4-way, 2-position, spool-type, direct-acting, screw-in hydraulic cartridge valve. In the de-energized modethe SVA0.S08 flow paths are 1 to 4 and 3 to 2. In the energized mode the valve’s spool shifts to open 1 to 2 and 3 to 4. The rigiddesign using a 1-piece body contributes to minimize the effect of eccentricities in cavity and provides great reliability. All ports areconnected at crossover. Low pressure drop thanks to optimized paths.
  • Product Attributes

    • WeightKg
      • 0.16
    • Installation torqueNm
      • 25 - 30
    • Filtration
      • 20/18/15 iso 4406 (maximum filtration admitted)
    • Orientation
      • No restrictions
    • Oil Testing Conditions
      • ISO VG 46 cSt
    • Fluid
      • Mineral - based or synthetics with lubricating properties
  • Pressure Attributes

    • Max PressureBar
      • 250.0
  • Flow Attributes

    • Max Flowl/min
      • 20.0
    • ViscositiescSt
      • 7.4 - 420
SKU Override Type Price Add to shopping cart Favorites
SVA0.S08.03.B00Push pin
Delivery time: 8-10 weeks
SVA0.S08.03.C00Push pin
Delivery time: 8-10 weeks
SVA0.S08.03.D00Push pin
Delivery time: 8-10 weeks
SVA0.S08.03.E00Push pin
Delivery time: 8-10 weeks
SVA0.S08.03.F00Push pin
Delivery time: 8-10 weeks
SVA0.S08.03.G00Push pin
Delivery time: 8-10 weeks
SVA0.S08.03.H00Push pin
Delivery time: 8-10 weeks
SVA0.S08.03.I00Push pin
Delivery time: 8-10 weeks
SVA0.S08.04.A00Push knob
Delivery time: 8-10 weeks
SVA0.S08.04.B00Push knob
Delivery time: 8-10 weeks
SVA0.S08.04.C00Push knob
Delivery time: 8-10 weeks
SVA0.S08.04.D00Push knob
Delivery time: 8-10 weeks
SVA0.S08.04.E00Push knob
Delivery time: 8-10 weeks
SVA0.S08.04.F00Push knob
Delivery time: 8-10 weeks
SVA0.S08.04.G00Push knob
Delivery time: 8-10 weeks
SVA0.S08.04.H00Push knob
Delivery time: 8-10 weeks
SVA0.S08.04.I00Push knob
Delivery time: 8-10 weeks
SVA0.S08.08.A00Screw
Delivery time: 8-10 weeks
SVA0.S08.08.B00Screw
Delivery time: 8-10 weeks
SVA0.S08.08.C00Screw
Delivery time: 8-10 weeks
SVA0.S08.08.D00Screw
Delivery time: 8-10 weeks
SVA0.S08.08.E00Screw
Delivery time: 8-10 weeks
SVA0.S08.08.F00Screw
Delivery time: 8-10 weeks
SVA0.S08.08.G00Screw
Delivery time: 8-10 weeks
SVA0.S08.00.A00No override
Delivery time: 8-10 weeks
SVA0.S08.00.B00No override
Delivery time: 8-10 weeks
SVA0.S08.00.C00No override
Delivery time: 8-10 weeks
SVA0.S08.00.D00No override
Delivery time: 8-10 weeks
SVA0.S08.00.E00No override
Delivery time: 8-10 weeks
SVA0.S08.00.F00No override
Delivery time: 8-10 weeks
SVA0.S08.00.G00No override
Delivery time: 8-10 weeks
SVA0.S08.00.H00No override
Delivery time: 8-10 weeks
SVA0.S08.00.I00No override
Delivery time: 8-10 weeks
SVA0.S08.03.A00Push pin
Delivery time: 8-10 weeks
SVA0.S08.08.H00Screw
Delivery time: 8-10 weeks
SVA0.S08.08.I00Screw
Delivery time: 8-10 weeks

Found what you are looking for?

We would love to talk to you about engineering and other services surrounding hydraulics. Get in touch with us to discover the possibilities!

Request Quotation